BIOKIL. Premium Liquid Tanking – 5L/10L/20L
BIOKIL. Premium Liquid Tanking – 5L/10L/20L - 5L is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Customer Services
Customer Services
Got a query? Call 0330 055 8210
We're open from 8am to 5pm, Monday to Thursday, and 8am to 4:30pm on Friday.
Delivery and Shipping
Delivery and Shipping
Delivery is £12.50 + VAT to UK Mainland. Orders over £100.00 + VAT qualify for free delivery, except for certain products—these will be clearly shown at checkout.
Orders placed by 3pm (stock permitting) are dispatched the same working day on a next working day service (not guaranteed).
Some areas, like Northern Scotland, may take 2–3 working days.
Northern Ireland, Channel Islands and Isle of Man at extra cost – contact us for a quote
We're open:
Mon–Thurs: 8am–5pm
Friday: 8am–4:30pm
Call us: 0330 055 8210
BIOKIL. Premium Liquid Tanking
Water-Based Liquid Waterproof Coating & Gas Barrier for Above-Ground Use
BIOKIL. Premium Liquid Tanking is a single-pack, water-based liquid waterproof coating, supplied ready to use. It cures to a flexible, elastic damp-proof and gas-resistant membrane for above-ground work on solid floors, screeds, embedded timbers, floor-to-wall junctions and low-level walls up to the DPC.
It goes on by brush, roller or airless spray – including onto damp (but not wet) surfaces – and is touch-dry in around one hour. Once cured it acts as a barrier to damp, radon, methane and carbon dioxide. Colour: black.
Key Features & Benefits
- Waterproof damp-proof coating, ready to use
- Single-pack, water-based styrene-butadiene latex
- Barrier to radon, methane and carbon dioxide
- Brush, roller or airless spray application
- Two coats form a continuous, flexible membrane
- Can be screeded over
- Available in 5-litre, 10-litre and 20-litre containers
Typical Applications
- Solid concrete floors and screeds (cured at least 28 days)
- Embedded timbers and floor-to-wall junctions
- Low-level walls up to the DPC (typically under 100 mm)
- Preparation beneath laminate floors
- New-build and refurbishment damp and gas protection
Surface Preparation
Surfaces must be sound, clean and smooth, and free from dust, grease, old coatings, laitance and standing water. Point masonry flush, repair defects and take off all loose material. Allow new concrete or screeds to cure for at least 28 days.
- Sound surfaces: no primer needed – dampen with clean water, leaving no standing water.
- Weak or friable surfaces: remove weak material mechanically, vacuum and apply 2 coats; or prime with BIOKIL. SBR Bonding Agent and coat while tacky; or prime with the product diluted by 30% with water.
- Trial area: always test adhesion before the full application.
Application
- Stir thoroughly before use.
- Apply 2 coats by brush, roller or airless spray, each at 0.55 L/m² (1.1 L/m² in total).
- A dry film of at least 0.6 mm is needed for vapour barrier performance.
- Apply the second coat at right angles once the first is touch-dry (approx. 1 hour), and within 24 hours.
- Do not apply too thickly, as this can cause surface cracking.
- Do not apply below 7°C; keep the area well ventilated. No special curing is needed.
Screeding Over the Coating
Lay the screed while the second coat is still tacky; or blind the tacky surface with fine sharp sand or kiln dried quartz; or, if fully cured, apply a further primer coat and screed while it is tacky.
Limitations
- Not a wearing or trafficable surface.
- Do not expose to direct sunlight in external use.
- Not suitable where there is negative water pressure (e.g. basements).
- Low-level wall application up to the DPC only (typically under 100 mm).
- Do not bond wood flooring directly to coated concrete.
Coverage
| Pack | Vapour barrier (2 coats, 0.9 m²/L) | General-purpose DPM (1.4–1.8 m²/L) |
|---|---|---|
| 5 litres | 4.5 m² | 7–9 m² |
| 10 litres | 9 m² | 14–18 m² |
| 20 litres | 18 m² | 28–36 m² |
Technical Information
| Property | Specification |
|---|---|
| Colour | Black |
| Density | 1.00–1.40 g/cm³ |
| Composition | Styrene-butadiene latex & water |
| Application | 2 coats at right angles, 0.55 L/m² per coat |
| Touch-dry | Approx. 1 hour |
| Minimum application temperature | 7°C |
| Water vapour permeability | < 4 g/m²/24 h @ 25°C / 75% RH |
| Methane resistance | 10× more resistant than LDPE |
| Radon resistance | Radon barrier at 2 mm dry film |
| Tensile strength | 4 N/mm² |
| Elongation at break | 350% |
| Bond strength | Fletton brick 2.5 N/mm²; timber >1.0 N/mm²; concrete >1.0 N/mm² (after 3-month soak) |
| Storage | 5–35°C, dry conditions |
| Shelf life | 18 months |
| Pack sizes | 5 L (BIO-1108), 10 L (BIO-1101), 20 L (BIO-1100) |
Produced under ISO 9001 & ISO 14001 quality systems. Tested to BS3177, BS8204, BS903 and CP102:1973.
Health & Safety
Contains isothiazolinones – may cause an allergic skin reaction (H317). Read the label and Safety Data Sheet before use.
Download the BIOKIL. Premium Liquid Tanking technical data sheet (PDF)
Download the BIOKIL. Premium Liquid Tanking safety data sheet (PDF)
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
